































Before development begins, we align on commercial and confidentiality terms:
Review and acknowledge our payment terms, production standards, and return/exchange policy
Sign a mutual Non-Disclosure Agreement (NDA)to protect both parties
Timeline: 1 working day
>> Contact us to receive our NDA
Design Submission
Submit 2D or 3D files (AI, PDF, STEP, STL, etc.), including logo and component details.
Component Confirmation
Charm style, main chain type, clasp selection, and extension chain length are defined.
Engineering Review
Structure, dimensions, thickness tolerance, and functionality are evaluated for mass production feasibility and provide you with optimization suggestions.
Commercial Alignment
Quantity, lead time, logistics, and packaging requirements confirmed.
Timeline: 1–2 Working Days
Detailed Quotation: We will provide a detailed quotation within 24 hours. This includes the EXW (factory) price, mold fees (if applicable), sample fees, and shipping costs.
Pay the deposit: Please review the Proforma Invoice (PI) and pay the deposit. Once we receive the payment, we will immediately begin work on the project.
Transform your hand-drawn sketches or reference images into CAD/3D models.
Before mold production, we provide a 1:1 scale printed paper sample with a wearing demonstration video to verify size proportions and prevent unnecessary mold revision fees.
Confirm Every Detail: You can check the exact dimensions, thickness, and logo placement again before the sample is made.
Timeline: 2–5 Working Days
We select the most suitable process based on your design and structure.
Shaping methods include lost-wax casting, MIM, laser cutting, CNC engraving, stamping, or 3D printing.
Finishing options: mirror polish, brushed texture, water plating, PVD plating.
Mass production begins after sample approval.
Timeline: 7–20 days (depending on complexity)
Mass production follows approved samples with stage-by-stage quality control:
Incoming Material Inspection
Forming & Casting: Verify dimensions and structural integrity.
Polishing: Check surface smoothness and defects.
Assembly: Confirm stone setting and specialty processes.
Plating: Test thickness, adhesion, and color consistency.
Final Inspection: Ensure appearance, durability, and function.
Environmental Reliability Test: Salt spray test, tensile test, constant temperature and humidity test
Timeline: 25–45 days.
Third-Party Inspections: Appointments can be arranged with agencies such as SGS, ITS, BV, and Intertek.
Anti-Corruption & Ethical Audit: Optional compliance document signing available.
AQL Standards: Inspections follow AQL 2.5/4.0.
Physical & Chemical Testing: Materials and plating tested for REACH, RoHS, and California Prop 65 compliance.
Reports & Costs: Test reports provided; fees depend on order value. For large orders, testing fees may be reduced or waived.
Timeline: 3–5 working days.
30 MOQs to help you test the market without the risk. Contact us today to start your OEM/ODM project.